Jamie Rest

P3 Heeley Housing The housing project was based in Heeley, approximately a twenty minute walk south from Sheffield City Centre. The project began with two introductory projects which included the development of a masterplan for Heeley and an in-depth critical study of a housing precedent prior to beginning design. The housing brief required the design of a mixture of two and three bedroom family […]

Posted in CLASS OF 2016 | Tagged , , , , , , , , , , , , | Comments Off

Gabriele Pauryte

P1 ‘threshold': kayak center in Owlerton, Sheffield P1.3 ‘threshold': ‘kayak community center’.  Owlerton site in Sheffield used to be one of the most industrial areas in the city. All the factories had been demolished but the footprints of the industries stayed as a silent reminder of the past. Kayak center design was meant to illustrate the […]

Posted in CLASS OF 2015 | Tagged , , , , , , , | Comments Off