Oliver Dorrington

  P1: Thresholds – Cycle Hub Tasked with designing a cycle hub on the edge of the Peak District in Owlerton, we chose our area based on the fact it crossed over three thresholds. There was a cycle path/walkway, a river and a road. This ended up being a good place to situate our hub […]

Posted in CLASS OF 2018 | Tagged , , , , , , , , | Comments Off

Wong Chiu Ho Anthony

    YEAR 2 PORTFOLIO About The Second Year at the Sheffield School of Architecture was a valuable time for me to re-evaluate my previous design methods and to experiment on techniques that I wasn’t comfortable with in the First Year, expanding my skills in both hand-made and computer-made methods. Throughout the 3 three studio projects with […]

Posted in CLASS OF 2018 | Tagged , , , , , , , , , , , , , , , , , , , , , , | Comments Off

Shipra Dawar

P1 Hikers Refugee P2 Theatre   P3 Social Housing

Posted in CLASS OF 2018 | Tagged , , , , , , , , , , , , , , , , , , | Comments Off

Alice Wildgoose

 P1: OBSERVATORY  The site was located on the top of Higger Tor, a gritstone tor overlooking Burbage Valley in the Peak District, around 10 miles outside of Sheffield. Here, we had to design an observatory, a small building which can accommodate several professionals for overnight stays and small school groups throughout the day. The building must […]

Posted in CLASS OF 2018 | Tagged , , , , , , , , , , , , , , , , | Comments Off

Holly Madeley

A Hatchery in Millhouses Park The brief for this project was to design a hatchery to house up to 40 chickens, with secure outdoor space for them to roam. My response to the brief developed through the investigation of the site, Millhouses Park in Sheffield, where a long, winding pathway guides pedestrians through areas with […]

Posted in CLASS OF 2017 | Tagged , , , , , , , , , , , , , , , | Comments Off

Amber Seipel

Amber Seipel Second Year Portfolio  Sheffield School of Architecture P1- Hatchery Millhouses Park, Sheffield Project one was the task of designing a building to accommodate up to 40 chickens, with space to roam in the day and a secure space for night. Considerations were to be given to storage of equipment, space for both outdoor […]

Posted in CLASS OF 2017 | Tagged , , , , , , , , , , , , , , , , , , , , , , | Comments Off

Diana Rosca

Diana Rosca 2nd year portfolio K100 – SSoA           P1 – Threshold               P2 – Theatre                 P3 – Housing     P1 – Threshold – Rivelin Vlaley Bakery Located in Rivelin Valley, the design had to consider human responses to […]

Posted in CLASS OF 2017 | Tagged , , , , , , , , , , , , , | Comments Off

Luke Cameron

Project 3 // Housing // Heeley  Our brief was to design a housing project to accommodate both families and an additional domestic group with an emphasis on the approach towards the shared space offered by the collective nature of the project. After doing the neighbourhood study of Heeley, I was specifically interested in the community feel generated […]

Posted in CLASS OF 2017 | Tagged , , , , , , , , , , , , , , , , , , , , , | Comments Off

Emma Donnellan

P1: South Street Cycle Centre­ The brief for this project was to design a temporary cycle centre at South Street Park, Sheffield. The cycle centre had to include storage for up to 50 bikes, a maintenance and repair area, a place to prepare hot drinks and changing and bathroom facilities. I chose to utilise the […]

Posted in CLASS OF 2017 | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , | Comments Off

Sam McMillan

Sam McMillan Sheffield School of Architecture 2nd Year Portfolio     Malin Bridge, Sheffield In this project we were required to design a bakery with attention paid specifically toward the proccess of leavening- the rising and fermentation of dough. Through research of this we needed to design ample space for this proccess to take place […]

Posted in CLASS OF 2017 | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Comments Off